Showing posts with label Quality. Show all posts
Showing posts with label Quality. Show all posts

Jul 31, 2022

Turtle Diagram

 What is a turtle diagram?. 


“Turtle Diagram” is a great tool for visualizing process characteristics.  Processes are made up of inputs, outputs, criteria, etc, and a Turtle Diagram visualizes a process to assist in their effective execution and improvement. The diagram looks like the body of a turtle, with components as body, legs, head, and tail.


Benefits of Using Turtle Diagrams


Turtle Diagrams allow you to look at the entire process, as well as the communication and mapping of interrelated processes with relevant functions and levels within the organization. Turtle Diagrams can help both management and the workforce better understand the process. The diagram helps layout the framework in an easy to follow fashion, and can identify gaps in the organization’s structure.


Where do you use a Turtle Diagram?


They can be used for any process, anywhere in the ISO 9001 does not require a turtle diagram, but the turtle diagram can help you understand your processes as well as define the criteria for measuring process effectiveness.  There are several clauses within the ISO 9001 requirements that may benefit from using a turtle diagram.


So how do you use a Turtle Diagram?


Using a turtle diagram is simple. The Turtle Diagram is made up of 6 areas, all surrounding the process, which is considered the turtle body. The 6 areas are: inputs, materials & equipment (what), support processes, procedures & methods (how), outputs, competence skills & training (whom), and finally performance indicators (results).


Process: 


The center of the diagram is titled “process”. This box address the value adding step, and any sequence that fall within the scope of the process. A process may involve many employees and multiple departments within your organization.


Inputs: 


This category should define the details of the actual process including: documents, materials, information, requirements, etc.


Outputs:


Should include details of the process such as products, documents, etc.


Support processes, Procedures & Methods: Support material includes, procedures, instructions, specific methods, etc.


Whom: 


This section is dedicated to finding all the employees whose roles within the organization have the responsibility to value adding steps within the process.


What: 


This section is dedicated to finding the resources needed to perform the process


How: 


This section is dedicated to identifying any specific documents within the management system that tell the people responsible for completing the value added steps how to successfully complete them within the organization’s best practice.


Results: 


This section looks at the measures the organization has at its disposal to monitor how well the procurement process is performing. If the measures align to the organization’s plan, policies goals and objectives, the the measures should be able to tell management if the procurement process is fulfilling or needs to be adjusted or improved.

Jun 15, 2019

RPN, Risk Priority Number, Severity, Occurrence, Detection In FMEA

Severity :
It is the effect of a failure.
Consider how serious effect of the failure mode.
Rank is assigned to seriousness of the failure mode from 1 to 10 ( 10 is very severe /dangerous and 1 is no effect.

Occurrence :
It is the likelihood of occurrence of the failure during production.
Rank is given to occurrence from 1 to 10. (10 is very high occurrence and 1 is almost zero.

Detection :
It is the rank indicating the control in the process to detect the failure.
Rank is given to control mechanism from 1 to 10 (10 is No control and 1 is almost not possible to create the defect.
1 is given when Pokayoke type control is implemented where defect is completely eliminated.

SOD/ RPN :
It is the outcome of multiplication of Severity,Occurrence &Detection.
RPN= Severity x Occurrence x detection. 

High RPN no. Indicates high risk Low RPN no. Indicates Low risk.

For high RPN, Based on the RPN No. Action plan is planned, implemented & RPN no. is reduced.

Also Read
PDCA, PPAP, QA/QC , Quality,  Six Sigma., 

Nov 20, 2018

Why why Analysis

Why why Analysis is a tool to find out the root cause of a problem.

It's a very simple but effective method- asking Question.

This tool can be applied parallel with Brainstorming, Fish Bone Diagram.

Question to be asked 'why the problem is ?' to the team and The team will think the problem based on experience, historical data and give the answer.

Repeating Why to the answer, can be asked until  reaching  to the root cause.

Example:
Problem : Leakage in hydraulic pump.
Ask Why to above problem ...

Why1 :- Why there is leakage ?
Ans:       Oil seal damage ...
Why2 :- Why oil seal damage ?
Ans :-      problem in fitting
Why3:- Why problem in fitting ?
Ans :      oil seal was of wrong size

Questioning can be continued until reach to potential causes of the problem.

Questioning to the problem, branches may be 1 or more than one as the answer may be 1 or more. One or more causes may be come as outcome by why why analysis ... 

Nov 1, 2018

Fish Bone Diagram

Fish Bone Diagram also known as
-Ishikawa diagram
-Cause & effect Diagram.

Kaoru Ishikawa had invented the strategy known as Ishikawa diagram/ cause & effect Diagram, it looks like bone of fish, hence it's also known as fish bone diagram.

The diagram shows the possible causes of a problem. It helps team to find out potential causes to identify root causes. It's a pictorial representation of why why analysis.

                                Figure-1.
See above,
Keeping the problem right ( mouth of a fish.)
in any problems, 6M's are bones of that problem.
1. Man                    2. Machine
3. Method              4. Material
5. Measurement   6. Mother Nature

Keep these as bones of the fish. As seen in above figure.

Now ask : Why this Problem is ?
You may get potential causes which may related to 6M's as above. Place the causes in relevant field  Cause-1 as seen in below figure.
                                              Figure-2.

Asking to cause-1, you may get cause-2.

Likewise, Fishbone diagram help to reaching to final root causes.
                 ***

Tags:- Also Read : 
PDCA, PPAP, QA/QC , Quality,  Six Sigma., 
 




Oct 31, 2018

Priority Matrix- important tool for projects.

While working for improvement, there may more no. Of projects which are in line ...
It is very important to select / prioritize the project to take more advantage in short time ( to eat low hanging fruits).

To take this advantage, project priority matrix plays important role.

Priority Matrix is a tool to prioritize which project/ improvement should be taken first and which can be put on last.

In this matrix, important parameters are taken into consideration :
1. Impact on Customer
2. Cost to execute
3. Benefits/ Savings
4. Length of projects
5. Resource availability
6. Feasibility in execution.
7. Success possibility ...

To make the priority matrix,
Step1- Row list of projects are listed in left column.
Step2-all above 7 parameters are placed as heading of columns.
Step3- table is ready for brainstorming.
Step4- consider ranking method
            i.e. 1,3,5  or 1,2,3, ...10. As convenient to the team.

Step5- Evaluate each of the projects based on the parameters field considering impact, gains and requirements and give ranking out of 1-3-5 or 1-2-3 ... -10.
Step6- last column after all parameters, we can get Priority index. (By multiplying all ranks)

See Example :
In above Matrix, Project-3 can be selected to to take first/ prioritized as having high Index.
***

Tags:- Also Read : 
PDCA, PPAP, QA/QC , Quality,  Six Sigma., 
 




Oct 29, 2018

MSA- Measurement System Analysis.

MSA - Measurement System Analysis
It is the tool, mathematical calculation/ experiment method to identify :
  • Variation within the measurement processes. 
  • How much contribution of the variation in total variation/ overall variation.
Below parameters to check in measurement system analysis:

  1. Linearity
  2. Stability
  3. Bias
  4. Reproducibility
  5. Repeatability
In above, Linearity, Stability and Bias are checked to find location. Repeatability and reproducibility are checked to find variation.

***

Tags:- Also Read : 
PDCA, PPAP, QA/QC , Quality,  Six Sigma., 
 

Oct 5, 2018

Use of data in Statistical Process control

Data collection is done through Measurement or readings in Product, Process or Service

The data is recorded. Various types of control charts are used -depend upon, which type of data are being collected.

 It's important to use correct type of chart  for effective outcome & receive useful information



Variable Data

  • Individual : Moving Range chart: 
When data is individual values



  • Xbar – R chart: 
When, Recording data in sub-groups of 8 or less


  • Xbar – S chart: 
When,  sub-group size is greater than 8


Attribute data


  • P chart – 
When,  recording the number of defective parts in a group of parts

Sep 27, 2018

Linearity

Linearity :
  * Measurement of consistency
  * Consistency of Bias
  * Over a range of a measuring equipment. 

Stability

Stability:
While measuring the known value / same sample, Its capacity of an instrument/ equipment or the person to measure same value over a time.

Feb 16, 2017

SWOT Analysis

SWOT analysis is a process which identify
S- Strength,
W- Weakness,
O- opportunity and
T- Threats of an organization.

It can be used to analyze what are the strengths, weakness and what opportunities, threats are  in a process, product, machine, industry.

Format of SWOT Analysis :


Benefits :
  • Very useful tool for preparing strategy for a business.
  • It can be applied in marketing, sales, production.
  • Can bring all possible roots on surface for an organization.
  • Can know what are the steps needed, where to concentrate.
  • Can take action to prevent potential harmful factors proactively.
Tags:- Also Read : 
PDCA, PPAP, QA/QC , Quality,  Six Sigma., 
 

Dec 10, 2016

Calibration


To compare the unknown value with respect to known Standard / Master.

In any process of measurement, we check the output of a process or product whether it confirms to requirements.
Before checking, it is very much required to check that the medium / instrument which we are using is giving correct value.
For this, the instrument must be compared with other one instrument/ equipment ( known as master) of which is having. Known value as required.
As this all above, calibration is a process which establish reliability of the measurement taken by the instrument.


As per requirement of ISO-9001 (Quality Management System), any monitoring and measuring equipments shall be calibrated or verified & it shall be traceable to national / international standards.

Considering above requirements, the instrument is required to be calibrated/ verified in such a way, so that the traceable to ational / international standards.

To fulfil the requirement, the master also must be calibrated by more accurate standards. This is a chain type process & linked any accredited laboratory.

For example,
1. 'A' instrument is to be calibrated.
2. 'B' shall be used as master.
3. 'B' is more accurate and calibrated by some other master 'C'.
4. Now, 'C' must be calibrated by National Laboratory or other master 'D' and the 'D' must be calibrated at National Laboratory.

Calibration/verification of an instrument can be done in house or by outside agency

Inhouse calibration :

  • Calibration should be done in controlled condition.
  • Parameters like temperature, humidity to be considered before & during calibration.
  • The master taken for reference shall be calibrated & confirm the requirements specified by relevant standard.

Jun 15, 2016

OEE = OVERALL EQUIPMENT EFFECTIVENESS

OEE - Overall Equipment Effectiveness.

This term is used to check the EFFECTIVENESS of a machine.
Its a production indicator which shows how effectively a machine is operating / working against planned output.

This is a best practice developed by -
"Seiichi Nakajima".

OEE is calculated with considering Availability, performance and Quality.

How to calculate OEE :

Consider  Following Terms :

1. Schedule time. =
2. Planned Downtime=
3. Net Available Time: NAT=
          (Schedule Time - planned downtime)
4. Unplanned Downtime =
5. Net Operating time: NOT =
           (NAT - unplanned downtime)

6. Cycle time.                =
7. Part Produced.         =
8. Part Scrapped.         =

9.   Ideal Operating Time: IOT =
        (Cycle time x Part Produced) /60 (if sec)

10. Lost Operating Time : LOT =

Calculations:
1. Availability=  NOT / NAT
2. Performance= IOT / NOT
3. Quality.         = (IOT - LOT) / IOT
4. Time to produce good parts = IOT-LOT
5. OEE.  =
    (Time to produce good parts / NAT)*100


Tags:- Quality, QA/QC, Quality Problem,  Quality Improvement, Root Cause Analysis. CAPA. PDCA.Statistical Quality Control Kaizen. Six Sigma. Scatter Plot. Seven QC Tools. Kanban. FMEA. Bench-marking. 5'S. LEAN. Good Habits for Successful Engineers, The key to success, SWOT Analysis, Calibration